{"id":3111,"date":"2022-02-28T11:23:15","date_gmt":"2022-02-28T09:23:15","guid":{"rendered":"https:\/\/www.apaoltenia.ro\/?p=3111"},"modified":"2022-02-28T11:30:00","modified_gmt":"2022-02-28T09:30:00","slug":"comunicat-28-02-2022-s-a-semnat-contractul-pentru-extinderea-retelelor-de-apa-si-canalizare-in-comunele-simnicu-de-sus-isalnita-si-cotofenii-din-dos","status":"publish","type":"post","link":"https:\/\/www.apaoltenia.ro\/index.php\/2022\/02\/28\/comunicat-28-02-2022-s-a-semnat-contractul-pentru-extinderea-retelelor-de-apa-si-canalizare-in-comunele-simnicu-de-sus-isalnita-si-cotofenii-din-dos\/","title":{"rendered":"COMUNICAT 28.02.2022: S-a semnat contractul pentru extinderea re\u021belelor de ap\u0103 \u0219i canalizare \u00een comunele \u0218imnicu de Sus, I\u0219alni\u021ba \u0219i Co\u021bofenii din Dos"},"content":{"rendered":"<p><strong><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-3113\" src=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-300x132.jpg\" alt=\"\" width=\"300\" height=\"132\" srcset=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-300x132.jpg 300w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-1024x450.jpg 1024w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-768x337.jpg 768w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-1536x674.jpg 1536w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-2048x899.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p><strong>Compania de Ap\u0103 Oltenia S.A. a semnat, ast\u0103zi, 28.02.2022, un nou contract de execu\u021bie lucr\u0103ri \u00een cadrul <em>\u201dProiectului regional de dezvoltare a infrastructurii de ap\u0103 \u0219i ap\u0103 uzat\u0103 \u00een jude\u021bul Dolj, \u00een perioada 2014-2020\u201d<\/em>. Este vorba despre DJ-CL-06, care prevede extinderea re\u021belelor de alimentare cu ap\u0103 \u0219i canalizare \u00een comunele \u0218imnicu de Sus, I\u0219alni\u021ba \u0219i Co\u021bofenii din Dos. <\/strong><\/p>\n<p><strong>La semnarea contractului au fost prezen\u021bi \u0219i primarii celor trei localit\u0103\u021bi, respectiv Tiberiu Dasc\u0103lu de la I\u0219alni\u021ba, Ion Dina &#8211; Co\u021bofenii din Dos \u0219i Dumitru Marius Cosmin \u2013 \u0218imnicu de Sus, care a\u0219teapt\u0103 \u00eenceperea lucr\u0103rilor.<\/strong><\/p>\n<p><strong>Contractul DJ-CL-06 <\/strong><strong>Extinderi re\u021bele ap\u0103 \u0219i canalizare \u00een comunele \u0218imnicu de Sus, I\u0219alni\u021ba, Co\u021bofenii din Dos<\/strong>, cu o valoare de 28.991.650,40 LEI<strong> (f\u0103r\u0103 TVA), a <\/strong>fost adjudecat de <strong><em>Asocierea S.C. BUGARU TRANS SRL (Lider de asociere)-HYDROSTROY AD<\/em><\/strong>.<\/p>\n<p>\u00cen comuna <strong><u>Co\u021bofenii din Dos<\/u><\/strong> lucr\u0103rile prev\u0103d extinderea re\u021belei de distribu\u021bie a apei \u00een Co\u021bofeni, Mih\u0103i\u021ba, Potmel\u021bu pe o lungime de 5.918 m, incluz\u00e2nd 371 bran\u0219amente. \u00cen plus se vor realiza 190 bran\u0219amente pe conductele existente (pe strada Dan Defleury), 27 c\u0103mine de golire, 7 c\u0103mine de van\u0103 \u0219i golire, 13 c\u0103mine de aerisire, 8 c\u0103mine de van\u0103, 9 vane \u00eengropate, 21 hidran\u021bi de incendiu supraterani. \u00cen plus se va realiza conducta de aduc\u021biune Mih\u0103i\u021ba \u2013 Potmel\u021bu, cu o lungime de 1.698 m, dar \u0219i conducta de aduc\u021biune Potmel\u021bu \u2013 Co\u021bofeni, \u00een lungime de 4.058 m.<\/p>\n<p>Pentru <strong><u>\u0218imnicu de Sus<\/u><\/strong> este prev\u0103zut\u0103 extinderea re\u021belei de distribu\u021bie a apei pe o lungime total\u0103 de 7.500 m, incluz\u00e2nd 276 bran\u0219amente, 11 c\u0103mine de golire, 13 c\u0103mine de van\u0103 \u0219i golire, 13 c\u0103mine de van\u0103, 9 vane \u00eengropate, 30 hidran\u021bi de incendiu supraterani. De asemenea, urmeaz\u0103 s\u0103 fie realizat sistemul de canalizare, cu o lungime total\u0103 de 23.242 m, precum \u0219i asigurarea transportului apei uzate colectate c\u0103tre re\u021beaua de canalizare a municipiului Craiova prin realizarea unui num\u0103r de 8 sta\u021bii de pompare ap\u0103 uzat\u0103 \u0219i conductele de refulare aferente, \u00een lungime de 2.785 m.<\/p>\n<p>\u00cen comuna <strong><u>I\u0219alni\u021ba<\/u><\/strong> se va extinde re\u021beaua de distribu\u021bie a apei, pe o distan\u021b\u0103 de 1110 m, incluz\u00e2nd 36 bran\u0219amente, 3 c\u0103mine de van\u0103, 5 hidran\u021bi de incendiu supraterani; se va extinde sistemul de canalizare \u00een partea de Nord a localit\u0103\u021bii, pe o lungime de 1079 m, \u0219i se va asigura transportul apei uzate colectate c\u0103tre re\u021beaua de canalizare a ora\u0219ului Craiova prin realizarea unui num\u0103r de 3 sta\u021bii de pompare ap\u0103 uzat\u0103 \u0219i a conductelor de refulare aferente, cu o lungime de 4.789 m.<\/p>\n<p>Contractul include lucr\u0103ri de construc\u021bie, furnizare \u0219i montaj utilaje \u0219i echipamente tehnologice, testare \u0219i punere \u00een func\u021biune, precum \u0219i remedierea eventualelor defec\u021biuni ap\u0103rute \u00een Perioada de Garan\u021bie. Durata de execu\u021bie a lucr\u0103rilor \u0219i punere \u00een func\u021biune a instala\u021biilor este de 30 luni, iar perioada de garan\u021bie este de 36 luni.<\/p>\n<p>Investi\u021biile cuprinse \u00een \u201eProiectul regional de dezvoltare a infrastructurii de ap\u0103 \u0219i ap\u0103 uzat\u0103 \u00een jude\u021bul Dolj, \u00een perioada 2014-2020\u201d, \u00een valoare de peste 445 milioane de euro, reprezint\u0103 un efort de a asigura un grad apropiat de 100% de acoperire cu servicii centralizate de ap\u0103 \u0219i ap\u0103 uzat\u0103 \u00een zona de operare a Companiei de Ap\u0103 Oltenia, pentru \u00eembun\u0103t\u0103\u021birea condi\u021biilor de via\u021b\u0103 a popula\u021biei jude\u021bului, beneficiari direc\u021bi fiind 355.405 locuitori.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-3116\" src=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100819-300x132.jpg\" alt=\"\" width=\"300\" height=\"132\" srcset=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100819-300x132.jpg 300w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100819-1024x450.jpg 1024w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100819-768x337.jpg 768w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100819-1536x674.jpg 1536w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100819-2048x899.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-3114\" src=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100712-1-300x132.jpg\" alt=\"\" width=\"300\" height=\"132\" srcset=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100712-1-300x132.jpg 300w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100712-1-1024x450.jpg 1024w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100712-1-768x337.jpg 768w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100712-1-1536x674.jpg 1536w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100712-1-2048x899.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-3113\" src=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-300x132.jpg\" alt=\"\" width=\"300\" height=\"132\" srcset=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-300x132.jpg 300w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-1024x450.jpg 1024w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-768x337.jpg 768w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-1536x674.jpg 1536w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100811-2048x899.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-3115\" src=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100749-132x300.jpg\" alt=\"\" width=\"132\" height=\"300\" srcset=\"https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100749-132x300.jpg 132w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100749-450x1024.jpg 450w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100749-768x1749.jpg 768w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100749-674x1536.jpg 674w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100749-899x2048.jpg 899w, https:\/\/www.apaoltenia.ro\/wp-content\/uploads\/2022\/02\/20220228_100749-rotated.jpg 1124w\" sizes=\"(max-width: 132px) 100vw, 132px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Compania de Ap\u0103 Oltenia S.A. a semnat, ast\u0103zi, 28.02.2022, un nou contract de execu\u021bie lucr\u0103ri \u00een cadrul \u201dProiectului regional de dezvoltare a infrastructurii de ap\u0103 \u0219i ap\u0103 uzat\u0103 \u00een jude\u021bul Dolj, \u00een perioada 2014-2020\u201d. Este vorba despre DJ-CL-06, care prevede extinderea re\u021belelor de alimentare cu ap\u0103 \u0219i canalizare \u00een comunele \u0218imnicu de Sus, I\u0219alni\u021ba \u0219i &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.apaoltenia.ro\/index.php\/2022\/02\/28\/comunicat-28-02-2022-s-a-semnat-contractul-pentru-extinderea-retelelor-de-apa-si-canalizare-in-comunele-simnicu-de-sus-isalnita-si-cotofenii-din-dos\/\"> <span class=\"screen-reader-text\">COMUNICAT 28.02.2022: S-a semnat contractul pentru extinderea re\u021belelor de ap\u0103 \u0219i canalizare \u00een comunele \u0218imnicu de Sus, I\u0219alni\u021ba \u0219i Co\u021bofenii din Dos<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,19],"tags":[34,35,27,28,32],"_links":{"self":[{"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/posts\/3111"}],"collection":[{"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/comments?post=3111"}],"version-history":[{"count":2,"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/posts\/3111\/revisions"}],"predecessor-version":[{"id":3118,"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/posts\/3111\/revisions\/3118"}],"wp:attachment":[{"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/media?parent=3111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/categories?post=3111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.apaoltenia.ro\/index.php\/wp-json\/wp\/v2\/tags?post=3111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}